Dirk William Byrd Objective:Employment in Project Controls /
Scheduling / Work Management Experience: February 2015 – Project Controls / Scheduler Currently working at the MOX Fuel
Fabrication Facility (MFFF) using P6, scheduling construction. Tasks include
day to day schedule updates, reconciling outyear budgets with labor and
material profiles. Imports to and from P6 / Excel to support material and
labor reporting. Custom Excel and VBA programming to support reporting and P6
imports for bulk data and fine details. March
2014 – August 2014 Nuclear IT Scheduler Worked with Duke Energy in Charlotte for
the Duke / Progress merger. Using MS Project 2010 to schedule both Duke
and Progress Information Technology projects. Worked with Project Managers and Program
Managers to manage resources to keep projects on schedule. Reported schedule variances as they occur
to allow PMs to apply resources as needed. I worked in Engineering Change (EC),
Engineering Data Base (EDB), Action Tracking (AT) and Performance Improvement
projects. Also Time Entry, and Maintenance and Test Equipment (M&TE) and
the Fleet Observations project (FOBS). All schedulers on the Duke / Progress
IT integration did Software Quality Assurance on all of their projects at
least once a week. We also cross checked each other’s projects and gave
feedback. February
2012 – June 2013 Sr. Scheduler / Project Controls Worked with Computer Science Corp. (CSC)
Program Management Organization (PMO) on the North Carolina Medicaid
Management Information System (NCMMIS) using MS Project 2007 with a Master
Schedule and 28 subprojects. This included transition from ICD-9 to ICD-10.
These projects were resource loaded by named resource for a total of about
1.5 M person-hours. I interfaced with several of the individual Project
Managers and Team Leads on a weekly basis to ensure over and under
allocations were kept to a minimum. I also did custom programming to extract
Project data and present it in Excel reports for end users without access to
MS Project. Reconciled financial timekeeping data with project schedule.
Performed monthly Earned Value reports based on existing CSC report formats.
CSC used the Capability Maturity Model Integration (CMMI). We did Software
Quality Assurance (SQA) on all projects at least once a week. July 2011 January 2012 Sr. Scheduler / Project Controls Installed $10M ISC upgrade to International
Paper Eastover, SC facility working for Zachry Industrial, Inc... Developed
custom macros and VBA code to create Master Schedule and resource loaded
daily schedule from Excel detail estimates. Met with staff and field
supervision to update monthly, weekly and daily schedules. Imported labor
cost actuals from Zachry proprietary database exports. Produced weekly status
reports, EVM, cost and schedule variance reports. Performed field walk-downs
to compare actual work with engineering drawings and schedules, monitor
safety and environmental compliance and other duties as required for Zachry
Industrial as an independent subcontract scheduler. March
2011 to June 2011 Contract Project Controls / Scheduler Worked with Primavera and MS Project.
Specialized in electronic transfer of Engineering Estimates to new or
existing schedules, electronic update of actuals and projections, CPM
(critical path), “what if” analysis, actual versus planned (material and
labor) budget and cost, and Earned Value reporting. Experience with large
projects in nuclear and fossil energy and other large construction projects. October
2006 to March 2011Westinghouse Electric Co. Sr. Scheduler Implemented Work Management based on INPO,
DOE and other industry best practices; identifying functional equipment
groups (FEGs) and reviewing existing maintenance to group work, minimize
equipment downtime and increase maintenance quality and production on
existing equipment. Prepared detailed, resource loaded schedules, integrating
Project Systems Engineering and Major Projects work scope into these improved
maintenance plans. Primary scheduling tool was MS Project, also used
Primavera P3.1, P5 and P6. Mediated multi-discipline team status meetings.
Integrated schedules between maintenance, production, major projects and
plant systems engineering to identify both previously unrealized resource
conflicts between projects and windows of opportunity to integrate systems
upgrades and new project’s field execution windows with planned maintenance
cycles. Gathered and analyzed data; generated reports to track trends and
communication of current status and future projections to management, staff
and floor level personnel. Automated repetitive tasks to reduce re-keying
data in electronic formats between applications to increase productivity of
scheduling and maintenance planning organizations using VBA and other
programming languages. April
2006 to October
2006
Day &
Zimmermann
Scheduler Worked in Project Controls with D&Z NPS
for TVA May/June outage in New Johnsonville, TN. Primary responsibility was
creating multi-discipline resource loaded schedules from engineering and
vendor estimates using P3. These schedules were analyzed daily for fieldwork
progress, adherence to staffing plans and cost. Proficient in use of all
Microsoft Office application software, including using Visual Basic for
Applications (VBA) to automate electronic updating of information between
applications including Primavera, MS Project, Excel and third party software
such as SAP reports and Computerized Maintenance Management Software (CMMS). February
2006 to April
2006
Day & Zimmermann
Scheduler Worked in Project Controls with Westar for
spring outage in St. Marys, Kansas. Primary responsibility scheduling using
Microsoft Project. This schedule was resource loaded by work discipline and
included work order, purchase order and commodity code information. 2002–2005Westinghouse
Savannah River Co. (WSRC)Aiken, SC Senior Program Planner Worked in Project Controls at the Business
Unit level using P3.1 schedules and other reporting tools. Two weeks off-site
training in PMI / PMBOK techniques and methodologies. Helped develop format
for formal documentation of work scope definition during contract
renegotiation. Analyzed project status and spending reports. Produced
schedule, cost and earned value reports. Met with project managers and
project teams for monthly status updates. Created schedule and cost variance
reports to allow management to make decisions on which projects required
additional support, develop recovery plans or to accept the schedule/cost
variance. 1997–2002Westinghouse
Savannah River Co.Aiken, SC Program Planner Worked in Project Controls at the Division
level, developing guidelines and training to standardize practices and
integrate schedules and cost reporting for several High Level Waste
facilities at the Savannah River Site (SRS). Used Primavera P3, FoxPro and
Excel. 1994–1997
Westinghouse Savannah River Co.Aiken, SC Project Controls
Scheduler Worked in Project Controls at the facility
level. Responsible for daily work scheduling for the Defense Waste Processing
Facility (DWPF) during late construction phase, initial testing, hot
(radioactive) startup and operations using Finest Hour and later Primavera
P3. 1991–1994Bechtel,
Savannah River Inc. (BSRI)Aiken, SC Computer Programmer Designed, implemented and turned over to
local IT a Master Tracking System (MTS) used to drive the Defense Waste
Processing Facility (DWPF) to closure. Developed and turned over to local IT
a Surveillance Tracking system for the DWPF. 1988–1991Gulf
States, Inc.Freeport, TX Procedure Writer Wrote procedures for various system
checkouts and testing before turnover from construction to startup /
operations for the Defense Waste Processing Facility (DWPF) at the Savannah
River Site (SRS) near Aiken, SC. 1987–1988Pressure
FiltrationColumbia, SC Crew Leader Lead eight man environmental clean-up crew
for Pressure Filtration, Columbia, SC Successfully cleaned Westinghouse Fuels
calcium fluoride ponds near Columbia, SC. Successfully cleaned breached million
gallon phenol pond near Camden, SC. 1979–1987United
States NavyUSS Providence, SSN 719 Reactor Controls
Supervisor Qualified Submarines and Reactor Control
Supervisor, USS Providence, SSN 719. Submarine new construction, testing, and
initial reactor startup, Electric Boat, New London, Ct Electronics Technician / Reactor Controls
Instructor, Knolls Atomic, Middle Grove, NY Education: 2010 –
Computer Science,
Florida Institute of Technology 1990 -
2005
Senior, Industrial Mathematics,
USCA
Aiken, SC 1982 -
1984
Reactor Operations
Instructor
Middle Grove, NY 1981 -
1982
Naval Nuclear Power School
Orlando, FL 1972
Graduated Rock Hill
H.S.
Rock Hill, SC References:Available
by request. Interests:Boy Scouts of America, camping /
hiking / canoeing / archery Page 1 of 3 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|